Meridian Architecture Studio · Project 2026-04

The Threshold House

A single-family residence studied as an assembly: raft, frame, wall, roof, glass, interior. Scroll and the house builds itself in front of you, from structural base to finished interior.

Watch it assemble
Site0.4 ha
Footprint280 m²
Storeys1
OrientationSouth glazing
StatusCompleted 2026
Lead architectStudio

How the house is assembled

Scroll: the house builds · scroll back: it unbuilds
Stage 01 · Foundation

A raft in the clay

Read stage details

A reinforced concrete raft anchors the house. Its level surface supports every layer above.

Depth600 mm
Tolerance±4 mm
ConcreteC32/40
Stage 02 · Frame

Six columns, one ring

Read stage details

Six columns and a ring beam carry the roof, freeing the south wall to open towards the garden.

Columns6
Clear span9.9 m
SteelS355
Stage 03 · Walls

Three sides of weight

Read stage details

Rendered masonry on three sides provides warmth and privacy. The fourth side is left open for glass.

Masonry300 mm
RenderLime
U-value0.18
Stage 04 · Roof

A plane that overhangs

Read stage details

A flat zinc roof projects 1.8 m beyond the glazing, shading high summer sun and admitting winter light.

Overhang1.8 m
Build-up420 mm
FinishZinc
Stage 05 · Glazing

The fourth wall turns clear

Read stage details

Three triple-glazed panels close the south face. Low-iron glass keeps the garden’s colours clear.

Panels3
GlazingTriple
g-value0.35
Stage 06 · Interior

Quiet finishes

Read stage details

Oak floors, lime plaster and blackened steel keep the palette quiet, leaving the light to do the talking.

FloorOak 20 mm
WallsLime plaster
Area280 m²
Read all six construction stages
Stage 01 · Foundation

A raft in the clay

A reinforced concrete raft sits 600 mm into the ground, levelled to within four millimetres across the full footprint. Everything above trusts it.

Depth600 mm
Tolerance±4 mm
ConcreteC32/40
Stage 02 · Frame

Six columns, one ring

Six steel columns and a perimeter ring beam carry the roof, so the walls below never hold structure. That freedom is what lets the south face open completely.

Columns6
Clear span9.9 m
SteelS355
Stage 03 · Walls

Three sides of weight

Rendered masonry on three sides holds heat, sound and privacy. The fourth side is left open for glass. Compression on one hand, release on the other.

Masonry300 mm
RenderLime
U-value0.18
Stage 04 · Roof

A plane that overhangs

One flat plane cantilevers 1.8 m past the glazing. High summer sun stops at its edge; low winter sun slides underneath and warms the floor.

Overhang1.8 m
Build-up420 mm
FinishZinc
Stage 05 · Glazing

The fourth wall turns clear

Three triple-glazed panels slot into the frame from outside and seal in a day. Low-iron glass keeps the garden the colour it actually is.

Panels3
GlazingTriple
g-value0.35
Stage 06 · Interior

Quiet finishes

Oak underfoot, lime plaster on the walls, blackened steel at the edges, and nothing painted white. The finishes stay quiet so the light does the talking.

FloorOak 20 mm
WallsLime plaster
Area280 m²
Site and context

How the house sits on the ground

The plan is a long rectangle running east-west. The long glazed face turns south, where the ground falls gently toward a line of old oaks. The north side holds service spaces against the boundary wall.

Entry is from the east, through a narrow court between house and wall. You arrive compressed, and the house opens ahead of you. The garden is read first from inside, not on approach.

There is no front door in the usual sense. There is a threshold, and then there is the living room.

N 24.0 m ENTRY the house LINE OF OAKS · SOUTH BOUNDARY WALL · NORTH WEST EAST
We build thresholds, not boxes. Every room here sits between two conditions: shelter and view, weight and light. The assembly is the argument, piece by piece.
Studio note, design review week 14
Material palette

Six materials, used honestly

Each one does one job and shows its age. Tap a card to return to the model with that material highlighted and the others dimmed. Choose Reset view to resume the construction sequence.

Floor plan

Ten spaces, one level

Tap a room to read its dimensions, orientation and what happens there. Living spaces line the south glass; service and sleeping rooms sit behind the masonry to the north.

Entry Study Utility Kitchen Dining Living Hall Bed 2 Bath Master Full-height glazing · south
Select a room

The whole plan

Ten spaces arranged on one level. Public rooms along the south glass, private and service rooms behind the masonry to the north. One hall runs the full length, with a single skylight at its midpoint.

Process

From brief to keys, three years

2023

Brief and site

The clients brought us the plot and a one-page brief. The first six months went to walking the ground at different hours, before we drew a line.

2024

Planning approved

Two committee hearings and a neighbour objection settled over a site visit. Permission granted in October, after a revised section through the roof.

2025

Ground broken

Foundation in April, frame up by August, roof on before the first rains. Winter spent closing in and working inside.

2026

Keys handed over

April. The garden still needs a year to settle. The house will take ten.

Questions

What people usually ask

Enquiries

Discuss a site with us

We take on four projects a year, no more. Tell us where the site is, what the ground does, and how you imagine living there.

Email: studio@meridian-arch.example

Phone: +1 (415) 555-0142

Studio: 14 Alder Street, San Francisco

This is a fictional architecture project. This page has no server behind it. Review your details, then choose whether to open the draft in your email app. The address is a demonstration placeholder; nothing is stored or sent by the site.